The project will support small to medium water utilities through innovative structured financing in the Italian region of Veneto.
1 September 2026
Under appraisal | 18/08/2026
20260514
VIVERACQUA HYDROBOND 7
VIVERACQUA SCARL
EUR 80 million
EUR 179 million
The project will support small to medium water utilities through innovative structured financing in the Italian region of Veneto.
The project concerns the modernisation and upgrading of water collection, treatment and supply infrastructure. The water supply components include the extension and rehabilitation of water supply networks and related works, using best available technologies. The sanitation and wastewater components comprise investments to extend and rehabilitate sewer systems and wastewater treatment plants, among other assets. Additional project components may include the installation of remote-control systems aimed at improving the efficiency of the operation and maintenance of existing and future assets and networks.
Some of the project components might be subject to a mandatory Environmental Impact Assessment (EIA) report, including public consultations. The decision of the competent Authorities regarding their EIA will be assessed during appraisal. The project components are likely to fall under Annex II of the EIA Directive (2011/92/EU) amended by the Directive 2014/52/EU, Strategic Environmental Assessment Directive (2001/42/EC), Habitats Directive (92/43/EEC), Water Framework Directive (2000/60/EC), Urban Wastewater Treatment Directive (91/271/EEC), Drinking Water Directive (2020/2184/EU) and Birds Directive (2009/147/EC). It is expected that the Project will generate significant environmental and public health benefits from reduced discharge of untreated wastewater to environmental bodies because of rehabilitated and upgraded sewer systems and WWTPs. Investments in water supply networks and distribution systems will result in reduced water losses, a more rational use of scarce water resources and the protection of local groundwater. The full environmental details will be further examined during appraisal.
The utility companies shall ensure that contracts for the implementation of the project will be tendered in accordance with the applicable EU procurement legislation Directives 2014/23/EU, 2014/24/EU or 2014/25/EU, where applicable, as well as Directives 92/13/EEC and 89/665/EEC as interpreted by the Court of Justice of the EU, with publication of tender notices in the EU Official Journal, as and where required. Information on awarded main suppliers/contractors for the implementation of the envisaged operation is not available.
Before financing approval by the Board of Directors, and before loan signature, projects are under appraisal and negotiation. The information and data provided on this page are therefore indicative.
They are provided for transparency purposes only and cannot be considered to represent official EIB policy (see also the Explanatory notes).
| # | Наименование новости | Тональность | Информативность | Дата публикации |
|---|---|---|---|---|
| 1 | MEDICAL EQUIPMENT AND INFRASTRUCTURE UPGRADE | 0 | 5.97 | 09-10-2026 |
| 2 | IBERDROLA PUMPED-STORAGE | 0 | 19.59 | 07-09-2026 |
| 3 | KLAIPEDA WATER AND SANITATION II | 0 | 4.06 | 13-05-2026 |
| 4 | TECHEU FUTURE TECH (INVESTEU VD) LE II | 0 | 5.92 | 23-09-2026 |
| 5 | VOLKSBANK INNOVATION LOAN FOR SMES AND MIDCAPS | 0 | 15.09 | 08-10-2026 |
| 6 | Ростовская область планирует дополнительно привлечь более 7 млрд рублей бюджетных кредитов | 0 | 0 | 09-02-2023 |
| 7 | MONTPELLIER CITE ALIMENTATION & HOTEL SECURITES | 0 | 5.49 | 07-10-2026 |
| 8 | Минстрой получил $320 млн заемных средств Нового банка развития на проект по водоснабжению | 0 | 0 | 02-07-2019 |
| 9 | В РФ 11 регионов дополнительно получат финансирование на улучшение систем водоснабжения | 0 | 0 | 26-08-2023 |
| 10 | Кабмин расширил доступ регионов к господдержке для создания гидротехнических сооружений | 0 | 0 | 08-11-2021 |