Вход на сайт

Просмотр новости

Найдите то, что Вас интересует

ISRO completes Gaganyaan separation tests ahead of first uncrewed mission in 2026

Дата публикации: 17-10-2026 00:23:20

The tests assessed module separation, umbilical disconnections and the ability of critical Crew Module systems to withstand shocks during separation

Основное содержимое страницы с новостью.

FILE PHOTO: ISRO has completed Crew Module-Service Module separation tests for the Gaganyaan programme ahead of the first uncrewed mission targeted for launch in 2026.

FILE PHOTO: ISRO has completed Crew Module-Service Module separation tests for the Gaganyaan programme ahead of the first uncrewed mission targeted for launch in 2026. | Photo Credit: Via PTI Photo

The Indian Space Research Organisation (ISRO) has successfully completed a series of Crew Module (CM)-Service Module (SM) separation tests for the Gaganyaan programme, validating the design adequacy of the separation system ahead of the first uncrewed mission, G1, which is targeted for launch in 2026.

Tests validate separation system design

The Gaganyaan Orbital Module comprises the Crew Module and the Service Module, which are connected through a separation system. Electrical and fluid servicing between the two modules is ensured through umbilical connections.

The modules are integrated before launch and function as a single unit from launch until the completion of the on-orbit phase of the mission. Before re-entry into Earth’s atmosphere, the Crew Module separates from the Service Module through a series of precisely sequenced events involving pyrotechnic devices and jettisoning systems.

To validate the overall design of the separation system, ISRO conducted the tests at the Vikram Sarabhai Space Centre (VSSC) in Thiruvananthapuram. The test setup simulated the integrated Crew Module-Service Module assembly and incorporated extensive instrumentation to assess the separation process.

The tests simulated the separation of the two modules, including the severing of multiple umbilical connections between them.

Critical Crew Module systems demonstrate robustness

According to ISRO, the tests not only validated the design adequacy of the separation system but also demonstrated the robustness and shock-survivability of several critical Crew Module subsystems.

These include avionics systems, inertial navigation systems, the Thermal Protection System in the aft and conical heat shields, the Crew Module Deployable Umbilical Shield, and pyrotechnic devices associated with the Crew Module Uprighting System and the Thermal and Humidity Control System.

Successful tests boost confidence ahead of G1 mission

The successful completion of the tests provides confidence in the functioning of the implemented separation system for the upcoming first uncrewed Gaganyaan mission, G1, which is targeted for launch in 2026.

Published on October 17, 2026

Схожие новости

#Наименование новостиТональностьИнформативностьДата публикации
1Программа "Гаганьян" успешно движется к финалу. ISRO подтвердила успешное проведение ...7813-07-2026
2ISRO испытала ракету SOLVE для проверки парашютов корабля Gaganyaan https://itzine.ru/news/space/isro-ispytala-raketu-solve-dlja-proverki-gaganyaan.html ...0505-07-2026
3Первый пилотируемый космический полёт Индии могут перенести на 2028 год: ...-2628-06-2026
4ИКИ РАН готов передать аппаратуру для орбитальной "Луны-26" в конце 2026 года0021-10-2025
5Индийская организация космических исследований (ISRO) получила разрешение Федеральной комиссии по ...0727-06-2026
6Какие цели выполнялись в космосе в 2026 году? 🌑 От ...011.7215-08-2026
7Испытания для подтверждения возможности работы МКС до 2024 года близки к завершению0029-10-2020
8Starship completes test flight, successfully splashing down in Indian Ocean08.3425-07-2026
9Центр Хруничева готовит рабочее задание для диагностики герметичности корпуса модуля МКС0025-03-2022

Классификация: Космос. Схожих патентов: 0. Схожих новостей: 9. Тональность: 0. Информативность: 9.14. Источник: www.thehindubusinessline.com.