Ракетный блок. PAM-D2. [Редактировать]

Технические характеристики

#ХарактеристикаЗначение
1ТопливоРДТТ
2Масса, тонн3,7
3Масса (сухая), тонн0,43

Экономические характеристики

#ХарактеристикаДата измеренияЗначение
1Стоимость (изготовления), млн. долл.5,89
2Количество (изготовленных блоков), шт.2

Найдено 344 документов по запросу «PAM-D2». [Перейти к поиску]


Дата загрузки: 2017-02-06
Скачать документ
Скачать текст
0.14/5
...; Pharmaceutical dosage form. INTRODUCTION Pamabrom (PAM) Paracetamol (PAR) ACAIJ, 13(1) 2013... Dalia Mohamed 7 Full Paper Pamabrom (PAM) Paracetamol (PAR) Paracetamol (PAR), chemically... PAR in pharmaceutical formulations. Pamabrom (PAM), (8-Bromo-3,7-dihydro-1,3dimethyl-1-H-purine-2,6-dione... constituents in compound PAR and PAM tablets in human plasma by... squares for simultaneous analysis of PAM and PAR in mixture form... mg PAR and 20 mg PAM, B.N. 11190 (manufactured by IDI, Portsaid...). Standard stock and working solutions PAM standard stock solution; 0.5 mg/mL... stock solution; 0.5 mg/mLin methanol. PAM standard working solution; 0.1mg/mLin... methanol. Procedures Spectral characteristics of PAM and PAR The zero-order... of PAM) for the determination of PAM and PAR, respectively. The D2 amplitudes... nm (zerocrossing of PAM) for the determination of PAM and Analytical CHEMISTRY... the determination of PAM the stored spectra of PAM were divided by... the ûrst derivative peak of (PAM/PAR) is measured at 271... corresponding concentrations in µg/mL of PAM is constructed. Alternatively, for the... the spectrum of 40 µg/mL PAM then the ûrst derivative of...-mL volumetric flasks, aliquots of PAM and PAR were accurately transferred... binary mixtures. For analysis of PAM/PAR binary mixture, the absorbance... at 243 nm (zerocrossing of PAM) corresponding to the content of... to get the concentration of PAM. Construct a calibration curve relating the... corresponding concentrations in µg/ml of PAM. Construct a calibration curve relating the... Paper luting different volumes of PAM and PAR working solutions into... (A1) contains pure samples of PAM and PAR separately, while the... constructed with different mixtures of PAM and PAR. The zero order... and A2, respectively. Determination of PAM and PAR in laboratory prepared... the calibration graphs. Determination of PAM and PAR in Pharmaceutical preparation... 25 : 1 (PAR : PAM) which inhibits the analysis of PAM as a minor ingredient...) of higher concentrations of PAM showed that PAM exhibits absorbance at 248... 1 : Absorption spectra of 25 µg/mL PAM (……) and 25 µg/mL PAR (_____... of PAM which could be determined by measurement of its D2 amplitude... its D2 amplitude at 265 nm; the zero crossing wavelength of PAM... µg/mL and 5-50 µg/mL for PAM and PAR, respectively. Third derivative... The third derivative spectra of PAM (Figure 3) showed the applicability of... studied. For the determination of PAM, measuring at 223 and 271... 265 nm and 20 µg/mL PAM (......) at 301 nm (Scale factor...; the zero crossing wavelength of PAM (Figure 3). The calibration graphs were... µg/mL and 5-50 µg/mL for PAM and PAR, respectively. Figure 3 : Third... 257 nm and 20 µg/mL PAM (......) at 290 nm (Scale factor... used for the prediction of PAM and PAR concentra- Analytical CHEMISTRY... Journal Figure 4 : Ratio spectra of PAM (1-50 µg/mL), divisor is 40... µg/mL), divisor is 40 µg/mL PAM. Figure 7 : First derivative of ratio... 258 nm, using 40 µg/mL PAM as divisor. performed, where better... µg /mL and 5-50 µg/mL for PAM and PAR, respectively. Two wavelength... derivative of ratio spectra of PAM (1–50 µg/ mL) at 271 nm... nm (ë3); the zero-crossing of PAM, which showed a linear correlation in... µg/ mL (Figure 9). The concentration of PAM could be calculated by subtracting... zero order absorption spectra of PAM at 222 nm (ë1) and 265... Paper 1-50 µg/mL and for PAM. Classical least squares method Chemometrics... for the simultaneous determination of PAM and PAR. To produce a calibration... of the constituents (A2)). Both PAM and PAR in the validation... µg/mL PAR (_____), 20 µg/ mL PAM (— —) and a binary mixture of 10 µg/mL PAM and 10 µg/mL PAR (++++). The... by analyzing 10 concentrations of PAM and 9 concentrations of PAR ranging... 243 nm against 20 ìg/mL PAM (......). Analytical CHEMISTRY An Indian Journal... of different blind samples of PAM and PAR. The concentrations were... of PAM and PAR by the proposed methods. PAM Parameter 1 PAR D2 D3... the analysis of PAM in pure form. 2ës 1 D2 D3 DD CLS Official... Recovery* µg/mL Recovery* 100.88 PAM** N Variance 0.99 99.90 0.99...) * Average of three different determinations; ** PAM is determined as 8- bromotheophylline; Values... determination of PAM and PAR by the proposed methods. Intraday PAM D2 Parameter... 0.13 1 DD CLS Inter-day PAM D2 D3 1 DD Parameter % % % Recovery Recovery... (n = 3), average of three concentrations for PAM and PAR repeated three times... (n = 3), average of three concentrations for PAM and PAR repeated three times... applied to the analysis of PAM and PAR in laboratory prepared... Dosage Forms TABLE 5 : Determination of PAM and PAR in laboratory prepared.... Concentration µg/mL D2 D3 1DD % Recovery* % Recovery* PAM PAR PAM PAR PAM PAR 20... % Recovery* % % % Recovery* Recovery* Recovery* PAM (ë1) (ë2) PAM PAR PAR PAM PAR 222 nm 265... the analysis of PAM and PAR in Womankit® tablets. D2 1 D3 2ës DD... 0.89 *Mean of recovery for PAM and PAR in three different... for the simultaneous determination of PAM (as 8- bromotheophylline) and PAR in... methods for the resolution of PAM and PAR in their multicomponent...



Дата загрузки: 2017-01-16
Скачать документ
Скачать текст
0.07/5
... with the Payload Assist Module-D (PAM-D) solid rocket motor, which fired... Palapa-B2. (Failure of the PAM-D rocket motors left both satellites... launch schedule. Failures of the PAM on earlier missions prompted an... Canadian communications satellite Telesat H (Anik-D2) and the Hughes Syncom IV... Mixing of Organic Solutions Anik-D2 RMS Figure 3–18. STS 51...-1 (Anik C-1) communications satellite attached to PAM-D motor. The Syncom IV-3 (also... first flight of the PAM-D2, the heaviest PAM payload yet (on the... deployed the Satcom KU-1 satellite/PAM-D. However, the Comet Halley Active... Business Systems Satellite (SBS-C)/PAM-D • Telesat-E (Anik C-3)/PAM-D Experiments and Equipment • Tile...) Commercial Payloads • Telesat-F (Anik C-2)/PAM-D • Palapa-B1/PAM-D NASA Payload • OSTA-2 (Office.../NRL) International Payload • Insat-1B/PAM-D Detachable Payload • Payload Flight Test.... Commercial Payloads • Westar VI/PAM-D • Palapa-B2/PAM-D Attached Payload • Shuttle Pallet... bee colony Commercial Payload • SBS-4/PAM-D • Syncom IV-2/Unique Upper Stage (Leasat-2) • Telstar 3-C/PAM-D *DB Chap 3 Tables (256-360... State Univ.) Commercial Payloads • Telesat-H/PAM-D (Anik D2) • Syncom IV-1/Unique Upper... Discovery Plt: Donald E. Williams • Telesat-I/PAM-D (Anik C-1) MS: M. Rhea Seddon, • Syncom... • Morelos-A/PAM-D MS: John M. Fabian, • Arabsat-A/PAM-D Steven R. Nagel, • Telstar 3-D/PAM-D Shannon W. Lucid... Payload Plt: Richard O. Covey • Aussat-1/PAM-D MS: James D.A. van Hoften, • ASC-1/PAM-D John M. Lounge, • Syncom IV-4/Unique ... Commercial Payloads • Morelos B/PAM-D • Aussat-2/PAM-D • Satcom KU-2/PAM-DII Experiments and Equipment..., Canada) Commercial Payloads • Satcom KU-1/PAM-D2 Experiments and Equipment • Materials Science... and Data Network (STDN) SBS-C/PAM-D Telesat-E 3/PAM-D (Anik C-3) G-026 Customer: DFVLR... (STDN) Deployed Satellites Telesat-F/PAM-D (Anik C-2), Palapa-B1/PAM-D Get-Away Specials... Data Network (STDN) Insat 1B/PAM-D G-346 Customer: Goddard Space Flight... (TDRSS) Deployed Satellites INSAT-1B/PAM-D Get-Away Specials None Experiments...) Deployed Satellites Westar-VI/PAM-D, Palapa-B2/PAM-D Get-Away Specials G-004... Network (STDN) Deployed Satellites SBS-4/PAM-D, Syncom IV-2/UUS (Leasat-2), and Telstar 3-C/PAM-D Get-Away Specials None Experiments... (TDRSS) Deployed Satellites Telesat-H/PAM-D (Anik D2), Syncom IV-1/PAM-D (Leasat-1) Get-Away... System (TDRSS) Deployed Satellites Telesat-I/PAM-D (Anik C-1), Syncom IV-3/UUS (Leasat... (TDRSS) Deployed Satellites Morelos-A/PAM-D, Telstar-3D/PAM-D, Arabsat-A/PAM-D, Spartan-1 (deployed and... System (TDRSS) Deployed Satellites ASC-1/PAM-D; Aussat-1/PAM-D, Syncom IV-4/UUS (Leasat... System (TDRSS) Morelos-B/PAM-D, AUSSAT-2/PAM-D, Satcom Ku-2/PAM-DII Deployed Satellites Get... (TDRSS) Deployed Satellites Satcom KU-1/PAM-DII Get-Away Specials The... navigation and position system; uses PAM-D2 upper stage STS-36/DOD... maritime Discovery communications services; uses PAM-D EOS—Commercial mission Columbia to... Columbia military communications satellite; uses PAM-D2 upper stage Classified Atlantis Assignments... cations and meteorological satellite; uses PAM-D TSS—NASA/Italy cooperative mission...



Дата загрузки: 2017-02-22
Скачать документ
Скачать текст
0.1/5
NASA SP-4025 ASTRONAUTICS AND AERONAUTICS, 1985 A Chronology THE NASA HISTORY SERIES Iw\sA Scientific and Technical Information Division 1988 Nat ional Aeronautics and Space A d m i n i s t r a t i o n Washington, DC NASA maintains an internal history program for two principal reasons: (1) Sponsorship of research in NASA-related history is one way in which NASA responds to the provision of the National Aeronautics and Space Act of 1958 that requires NASA to “provide for the widest practicable and appropriate dissemination of information concerning its a



Дата загрузки: 2017-01-16
Скачать документ
Скачать текст
0.18/5
... 14021) CREW COMPARTMENT PAYLOAD: 1. SBS-C/PAM-D (Satellite Business Systems/Payload Assist... Deployed Wt = 7,211 lb 2. ANIK-C/PAM-D - TELESAT Canada, Ltd/Payload Assist... WEIGHT, LB 16,944 1. ANIK-C/PAM-D: TELESAT Canada Satellite Deployed Wt = 7,374 lb 2. PALAPA-B1/PAM-D: Indonesian Satellite Deployed Wt = 7,575... WEIGHT, LB 22,631 1. INSAT/PAM-D: Indian National Satellite Deployed Wt..., LB 13,179 1. WESTAR VI/PAM-D - Western Union Communications Satellite/Payload... Deployed Wt = 7,307 lb 2.. PALAPA-B/PAM-D - Indonesian Communications Satellite/Payload Assist... None CREW COMPARTMENT PAYLOAD: 1. SBS/PAM-D (Satellite Business System/Payload Assist... Wt = 15,196 lb 3. TELSTAR/PAM-D (American Telephone & Telegraph/ Payload Assist...: 1. TELESAT-H (ANIK)-D2/PAM-D - Canadian 24 channel communications satellite. PAM D is a payload assist... proper transfer orbit due to PAM-D failure Retrieved weight: 1,262 lb... proper transfer orbit due to PAM-D failure. Retrieved weight: 1,119 lb... wt: 15,190 TELESAT-I (ANIK C-1)/PAM D - Canadian communication Placed in three...,258 DEPLOYABLE PAYLOADS: 1. TELSTAR-3D/PAM-D: Hughes 376 Comm Satellite with... AT&TCo Wt. = 7,546.0 2. ARABSAT-A/PAM-D: Aerospatiale Comm Satellite with McDac... Organization.. Wt. = 7,695.0 lb 3. MORELOS-A/PAM-D: Hughes 376 Comm Satellite withMcDac... CARGO WEIGHT, LB 8,595 ASC-1/PAM-D - American Satellite Company, first of... Industries and Continental Telecon Inc. PAM-D Payload Assist Module built by... Deployed Wt. = 7,591 lb AUSSAT-1/PAM-D - Australian Communications Satellite, owned by... WEIGHT, LB 15,323 1. MORELOS-B/PAM-D: Hughes 376 Comm Satellite with.... Deployed Wt = 7,573 lb 2. AUSSAT-2/PAM D: Hughes 376 Comm Satellite with... Wt = 7,634 lb 3. SATCOM KU-2/PAM-D2: RCA built/owned 16 channel... Assist Module D2 is an uprated version of the PAM-D used for... from St. Mary's SATCOM KU-1/PAM D-2: RCA built/owned 16 channel... PAYLOAD MISSION KITS: Ulysses/IUS/PAM-S - Deployable weight = 38,604 lb... KITS: ATTACHED PLB PAYLOADS: SPACELAB - D2 (German) payload User Support Structure...



Дата загрузки: 2017-01-23
Скачать документ
Скачать текст
0.06/5
... 2 crewmen (4). - First flight to deploy PAM-D (SBS-C). - First OV-102 flight... fan did not operate. TELESAT-E/PAM D EV-1 (Lenoir’s) suit regulator was... TEST ZERO-G DEMO PRIMARY: SBS-C/PAM-D (DEPLOYED) 3 CRYO TK SETS NO... lbs PRIMARY: TELESAT-F/ PAM-D (ANIK-C) DEPLOYED PALAPA-B1/PAM-D DEPLOYED M 3 EOM ETRPT...: Effector TV camera. INSAT-1B/PAM-D - INSAT-1B deployed on rev... RECON: 6961 PRIMARY: WESTAR-IV/ PAM-D (DEPLOYED) SPAS 01A MFR PLATFORM... landing at KSC. PALAPA-B2 / PAM-D RENDEZVOUS: (DEPLOYED) - Canceled planned RNDZ... IRT (DEPLOYED) orbit due to PAM-D nozzle failure. (Both satellites were... danger area. PRIMARY: SBS-D/PAM-D (DEPLOYED) TELESTAR 3-C/ PAM-D (DEPLOYED) SYNCOM-IV-2 (DEPLOYED...) VELOCITY 25870 FPS TELESAT-H/ ANIK-D2/PAM-D (DEPLOYED) RANGE 4141 NM PALAPA... deployed on STS 41-B but PAM Upper Stages failed. - EVA crewmen... : ET-17 TDRS-B/IUS-2 TELESAT-I/PAM-D FEE FPE PPE Donald E. Williams...: 22,576 lbs TELESAT-I/ ANIK C-1/PAM-D (DEPLOYED) WINDS: 3T,5R KNOTS... NM TELESTAR-3D/ WEIGHT: LAT: PAM-D DEPLOYED 204169 VELOCITY 14.89°N MORELOS-A/ LONG: 25850 FPS PAM-D DEPLOYED X CG: 1083.7 159.5°W RANGE ARABSAT-A/ 4050 NM PAM-D DEPLOYED SPARTAN-101DH (DEPLOYED & RETRIEVED... RECON: -1145 PRIMARY: ASC-1/PAM-D DEPLOYED AUSSAT-1/PAM-D DEPLOYED FLIGHT DURATION CHANGES... XFD OX Center Heater failed. PAM D-2 - WSB #3 Reg. pressure decay. DEPLOYED - Port PLS R-T-L CLOSE A failed. MORELOS-B/ PAM-D DEPLOYED - Port PLBD aft. - NLG Strut 3” low. AUSSAT-2/PAM-D - Volume H locker had to be... KU- 1/ 1/10/86. 1-day slip. PAM D2 - 1/10/86 launch scrubbed due.../ EXPERIMENTS PAYLOADS: PLB: ULYSSES/IUS/ PAM-S (SOLAR ORBIT) DEPLOYED WINDS: Light... Schlegel at work in SL-D2. MCC FCR-1 (34) FLIGHT DIRECTORS...: 7559 PAYLOADS: PLB: SPACELAB SL-D2/LM (Germany) + USS + GAS GAS... Transfer Device and IAPFR on PAM 1, installed Strela crane on PMA2...), ISS EXP 16 CDR, greets Pam Melroy, STS-120 CDR. RMS... left (center): Wilson/MS, CDR Pam Melroy, & Nespoli/MS (ESA). From...



Дата загрузки: 2017-01-10
Скачать документ
Скачать текст
0.05/5
... 2 crewmen (4). - First flight to deploy PAM-D (SBS-C). - First OV-102 flight... fan did not operate. TELESAT-E/PAM D EV-1 (Lenoir’s) suit regulator was... TEST ZERO-G DEMO PRIMARY: SBS-C/PAM-D (DEPLOYED) 3 CRYO TK SETS NO... lbs PRIMARY: TELESAT-F/ PAM-D (ANIK-C) DEPLOYED PALAPA-B1/PAM-D DEPLOYED M 3 EOM ETRPT...: Effector TV camera. INSAT-1B/PAM-D - INSAT-1B deployed on rev... RECON: 6961 PRIMARY: WESTAR-IV/ PAM-D (DEPLOYED) SPAS 01A MFR PLATFORM... landing at KSC. PALAPA-B2 / PAM-D RENDEZVOUS: (DEPLOYED) - Canceled planned RNDZ... IRT (DEPLOYED) orbit due to PAM-D nozzle failure. (Both satellites were... danger area. PRIMARY: SBS-D/PAM-D (DEPLOYED) TELESTAR 3-C/ PAM-D (DEPLOYED) SYNCOM-IV-2 (DEPLOYED...) VELOCITY 25870 FPS TELESAT-H/ ANIK-D2/PAM-D (DEPLOYED) RANGE 4141 NM PALAPA... deployed on STS 41-B but PAM Upper Stages failed. - EVA crewmen... : ET-17 TDRS-B/IUS-2 TELESAT-I/PAM-D FEE FPE PPE Donald E. Williams...: 22,576 lbs TELESAT-I/ ANIK C-1/PAM-D (DEPLOYED) WINDS: 3T,5R KNOTS... NM TELESTAR-3D/ WEIGHT: LAT: PAM-D DEPLOYED 204169 VELOCITY 14.89°N MORELOS-A/ LONG: 25850 FPS PAM-D DEPLOYED X CG: 1083.7 159.5°W RANGE ARABSAT-A/ 4050 NM PAM-D DEPLOYED SPARTAN-101DH (DEPLOYED & RETRIEVED... RECON: -1145 PRIMARY: ASC-1/PAM-D DEPLOYED AUSSAT-1/PAM-D DEPLOYED FLIGHT DURATION CHANGES... XFD OX Center Heater failed. PAM D-2 - WSB #3 Reg. pressure decay. DEPLOYED - Port PLS R-T-L CLOSE A failed. MORELOS-B/ PAM-D DEPLOYED - Port PLBD aft. - NLG Strut 3” low. AUSSAT-2/PAM-D - Volume H locker had to be... KU- 1/ 1/10/86. 1-day slip. PAM D2 - 1/10/86 launch scrubbed due.../ EXPERIMENTS PAYLOADS: PLB: ULYSSES/IUS/ PAM-S (SOLAR ORBIT) DEPLOYED WINDS: Light... Schlegel at work in SL-D2. MCC FCR-1 (34) FLIGHT DIRECTORS...: 7559 PAYLOADS: PLB: SPACELAB SL-D2/LM (Germany) + USS + GAS GAS... Transfer Device and IAPFR on PAM 1, installed Strela crane on PMA2...), ISS EXP 16 CDR, greets Pam Melroy, STS-120 CDR. RMS... left (center): Wilson/MS, CDR Pam Melroy, & Nespoli/MS (ESA). From...



Дата загрузки: 2017-02-06
Скачать документ
Скачать текст
0.33/5
National Aeronautics and Space Administration LyndonB. JohnsonSpace Center Houston, Texas vo Manifest destiny Coolfuel NASA's newest Mixed Fleet Manifest rearranges several of the next Space Shuttle missions. Chart on Page 3. A safer T-38 fuel with a higher "flash point" is being tested at Ellington Field. Story on Page 4. sp_ace News September undup 9, 1988 No. 'It's the final stretch' 26 , Countdown test cheers launch team The STS-26 crew boarded Discovery on Launch Pad 39B Thursday morning to go through a final dress rehearsal of the return to flight with Kennedy Space Center's Firing Room team. The Terminal Countdown Demonstration Test {TCDT), or "dry count," began with a call to stations for the launch team at 5 Readiness Review scheduled for Tuesday at Kennedy, and, at present, nothing has appeared that would interrupt the flow toward launch, he said. "We're still looking at sometime in the last week of Septemberfor launch." This week, technicians at the pad are performing a borescope inspection of the Orbi- nesday, and the simulatedcount- oxygen {GOX) system. Three " ' ST GOX flow control a.m. C DTWed-..__` S.26 ter's gaseous the hour downT-19 began at The Return to Flight valve parts were mark. T-0, the removed from culminationof the test,occurred about Discovery last weekend in an effort 9:30 a.m Thursday. The crew flew to determine why two of the valves spent that afternoon practicing approaches and landings on and the from JSC to Kennedy Tuesday Kennedy Shuttle runway in the Shuttle TrainingAircraft. The TCDT was the final major test before launch, said Daniel Germany, deputy director of the JSC Orbiter ProjectsOffice. "The last three weeks of this flow are really aimed at launch. There's no real majortest left after the TCDT," Germany said. "The next set of activitiesall dovetail togetherto lead to the final countdown. It's the final stretch." A firm launch date for STS-26 is expected to be set following a Flight readiness firing. Debris was found on the valve poppets removed the were sluggish during the Aug.from 10flight Orbiter, and they are now being studiedat Rockwell in Downey, CalJf. "We're converging on a solution for the problem," Germany said. "At this point, we don't forecast any launch delays due to the solution." Tests are being conducted to determine the source of the debris found on the poppets, and the results of the borescope inspection will be evaluated along with the condition of the valve poppets. The poppets will be cleaned and reassembled by Please SeeTERMINAL Page 4. i J.sc P_o_ _r_,u,_ Construction workers tear down a temporary wall separating Bldg. 9B from Bldg. gA Wednesday as the new 26,000-square-foot facility nears completion. 9B will house Space Station training and test equipment, including mockups such as the one at left. Construction A 27,000 square-foot facility to house Space Station Freedom mockupsand test bed equipment at JSC is nearing completion, and a grand opening is in planningfor next month. Bldg. 9B, an addition on the west end of Bldg. 9A, is now getting finishing touches from construction workers, and a temporary wall that separated the facility from 9A was torn down this week. 9B, built at a of 9B nearly cost of about $3 million, is one of the two largest construction projects at the center in recent years, the other being the Central Computing Facility, Bldg. 46, now in the works, 9B features a 21,000 square-foot high-bay area that will house high fidelitymockups ofthe space station habitation module, resource nodes, a sampling of the truss structureand the station's mobile work station, among other training structures,said done Chris Perner, chief of the ManSystems Division. "It will be unique from any other facility," Perner said. "We'll make use of the existing air-bearing floor and Orbiter Remote Manipulator System mockup and be able to practice transferring space station items from the payloadbay." The Space Station mockups now in the high bay of Bldg. 15 will be Please seeCOMPLETION, Page4. Work forges ahead on rest of Space Shuttle fleet While the eyes of the nation are focusedon STS-26, the first Shuttle flightin more_hantwo and a halfyears, preparations for the regular return of Americanstospaceareforgingahead. The processing and modificationof Atlantis, slated to fly STS-27, a Department of Defense mission in November, and of Columbia, scheduled to fly STS-28 in July 1989, are well under way at Kennedy Space Center. Both orbital maneuvering system podshave been installedon Atlantis, now in Kennedy'sOrbiterProcessing Facility(OPF} Bay 2, and the system's connections are being checked out this week.Also,the thirdand finalmain engine is now being installed in Atlantis. Stacking of the solid rocket motors (SRMs) for STS-27 is nearing completion in the Vertical Assembly Building. All of the SRM segments have been assembled, and work is now proceeding on the installationof thenosecones Meanwhile, radiators are being installedon Columbia,located...



Дата загрузки: 2017-02-23
Скачать документ
Скачать текст
0.22/5
... equipped with Payload Assist Module-D (PAM-D) solid rocket motor, which fired... attached to Payload Assist Module-D (PAM-D) motors. Seven Get Away Special... attached to Payload Assist Module-D (PAM-D) motor, was deployed. Nose of... failure of Payload Assist Module-D (PAM-D) rocket motors left them in...), attached to Payload Assist Module-D (PAM-D), deployed into geosynchronous orbit on..., attached to Payload Assist Module-D (PAM-D) motor. SYNCOM IV3 (also known... attached to Payload Assist Module-D (PAM-D) motors, were deployed: MORELOS-A, for... attached to Payload Assist Module-D (PAM-D) motors. SYNCOM IV-4 (also known... Module-D motors, SATCOM KU-2 to a PAM-D2 designed for heavier payloads. Two..., attached to Payload Assist Module-D2 (PAM-D2) motor, was deployed. Comet Halley... a mission-specific Payload Assist Module-S (PAM-S), combined together for first time...



Дата загрузки: 2017-02-06
Скачать документ
Скачать текст
0.13/5
... . . . . . . . . . . . . . . . . . . . . . . D.3 Comparing performance of distance measures D.4 PAM Clustering . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113 113 113 114... used as the input for PAM clustering, available in the R cluster... labels 68 train RF classifier PAM clustering genes time predict class... measure as an input to PAM clustering. This yielded three coherent... with the RF proximity measure. PAM clustering was performed with a supervised..., 2009). We have found that PAM clustering with the RF proximity... = dist(M) > ## try the Manhattan distance > d2 = dist(M,✬manhattan✬) > ## try the (unsupervised...] = 4 > cl = pam(d1,4) > m1 = outer(cl$clust,cl$clust,✬==✬) > cl = pam(d2,4) > m2 = outer(cl$clust,cl$clust,✬==✬) > cl = pam(d3,4) > m3...(cl$clust,cl$clust,✬==✬) > cl = pam(d4,4) > m4 = outer(cl$clust... recovering the true clustering identities. D.4 PAM Clustering Here we’ll demonstrate... Figure D.4. > K = sapply(2:10,function(k) silhouette(pam(d4,k))[,3]) > colnames(K) = 2:10 > Pk = sapply... perform the actual clustering using PAM, which is described in detail... (Kaufman and Rousseeuw, 1990). > cl = pam(d4,4) We can use these...



Дата загрузки: 2017-01-16
Скачать документ
Скачать текст
0.23/5
... fasilitas umum yang meliputi air PAM, prasarana ibadah. Penelitian ini bertujuan... air PAM dan angka 0 untuk perumahan yang tidak memiliki sarana air PAM D2... sebagai berikut : Y = α0 + α 1X1+ α 2X2 + α3 D1 + α4 D2 Y = 54406 – 454,473 X1 + 35,101X2 + 3732,27 D1 - 30107 D2 (-0,321) (0,317) (0,742) (-2,910) F-Hit... t-hitung α 0 + α 1LogX1+ α 2LogX2 + α 3 LogD1 + α 4Log D2 LogY = 38.396 – 0,976 X1... 54406 berarti X1, X2, D1, D2 ¬konstan maka Nilai Jual Tanah... diperoleh hasil : Y = α 0 + α 1X1+ α 2X2 + α 3 D1 + α 4 D2 Y = 7582.77 – 1894,76 X1...,607 D1 + 10.161,145 D2 (-1,153) (0,594) (0,235) (0,563) F-Hit... LogY = α 0 + α 1LogX1+ α 2LogX2 + α 3 LogD1 + α 4Log D2 LogY = 1.962 – 0,289 X1 + 1,077X2... LogY = α 0 + α 3 LogD2 LogY = 4.398 - 0,0207 D2 (-0,075) F-Hit = 0,006 Catatan : R2...,775 berarti X1, X2, D1, D2 konstan maka Nilai Jual Tanah...